Advertisement

Sunday, January 27, 2013

1MOSQUE: NAJIB DAN ANWAAAR - Antara Langit dan Bumi

1MOSQUE: NAJIB DAN ANWAAAR - Antara Langit dan Bumi: Nurul Izzah Mengamok Sakan...!  Report Card Prestasi Najib Tewaskan Anwar.... POSTED BY  MEDAN INFO KITA   AT  8:30 AM   ... anaknilai

Friday, January 25, 2013

ANAKNILAI: Anwar Sah Manusia Durjana.

ANAKNILAI: Anwar Sah Manusia Durjana.: Anwar Merendah Rendahkan Najib dan Bersifatkan Kurang Bijak Lawatan Najib ke Gaza... Inilah kenyataan Bangang dari ANWAR....orang l...

Friday, January 18, 2013

Berita Terkini !!! YAB Dato' Sri Mohd Najib Tun Razak Umum Calon Pilihanraya ???


Majoriti besar calon BN sudah diputuskan




Kuala Lumpur: Sebahagian besar calon Barisan Nasional (BN) sudah diputuskan dan sedang diteliti pada peringkat saringan akhir bagi menghadapi Pilihan Raya Umum Ke-13 (PRU-13) tidak lama lagi. 
Pengerusi BN, Datuk Seri Najib Razak, berkata penelitian itu mengambil kira aspek kemampuan calon dan penerimaan mereka di kawasan atau kerusi masing-masing bagi memastikan BN kekal menerajui pentadbiran negara. 


“Sebahagian besar calon sudah diputuskan walaupun masih ada tengah membuat penelitian dengan lebih mendalam lagi untuk memastikan pilihan kita adalah tepat, bukan saja dari segi kebolehannya, malah penerimaan di kawasan,” katanya.

Najib berkata demikian pada sidang media selepas mempengerusikan Mesyuarat Dewan Tertinggi BN, di Pusat Dagangan Dunia Putra (PWTC) di sini, malam tadi.


Pembahagian kerusi

Perdana Menteri berkata, mesyuarat berkenaan turut membincangkan pembahagian kerusi antara parti komponen BN dengan setiap parti diberikan panduan jelas untuk menghadapi PRU-13 tidak lama lagi. 
Beliau yang membayangkan PRU-13 ‘akan tiba tidak lama lagi’, menjelaskan mesyuarat berkenaan turut membincangkan keperluan penyediaan manifesto dan logistik serta beberapa aspek lain.

Ditanya mengenai pengumuman calon dibuat lebih awal sebelum hari penamaan calon, Najib berkata, ia akan ditentukan tidak lama lagi.

Najib menjelaskan, beliau peka terhadap tempoh akhir Dewan Undangan Negeri (DUN) Johor pada 21 Mac depan, tetapi pada masa sama, mengingatkan bahawa tempoh akhir Parlimen adalah pada 28 April depan.

“Ya, saya tahu itu tetapi tempoh akhir Parlimen kita ialah pada 28 April,” katanya.


Sokongan makin positif

Diminta mengulas sama ada mesyuarat berkenaan adalah yang terakhir, beliau berkata, boleh jadi ia yang terakhir dan boleh jadi juga akan ada mesyuarat lain selepas ini.

Najib berkata, sokongan rakyat terhadap BN semakin positif tetapi BN harus melipatgandakan usaha memenangi hati rakyat kerana dalam pilihan raya ada pelbagai faktor yang bakal mempengaruhi keputusan yang bakal dibuat rakyat.


Isu pendatang tanpa izin

Mengulas mengenai Suruhanjaya Siasatan Diraja bagi menangani masalah pendatang tanpa izin di Sabah yang sedang melakukan proses pendengaran, Najib berkata, ia membuktikan keikhlasan BN untuk menyelesaikan isu berkenaan.

“Seramai 167 saksi akan dipanggil untuk memberi keterangan. Biar suruhanjaya itu melaksanakan tugasnya dengan sempurna. Jangan pusing apa yang sedang berlangsung dalam pendengaran itu,” katanya.

Sumber :  Berita Harian


MWbmt

Terkini !! Khazanah National Berhad Mencatatkan Prestasi Kewangan Cemerlang Pada tahun 2012.


Aset Khazanah melonjak

 Ahmad Farizal Hajat | ahmadfarizal@bharian.com.myCetak
pix_gal0
Nilai portfolio pelaburan meningkat ke paras tertinggi baru

Khazanah Nasional Bhd mencatatkan prestasi kewangan cemerlang tahun lalu dengan nilai portfolio pelaburannya terus melonjak ke paras tertinggi baru.

Setakat 31 Disember lalu, Nilai Aset Direalisasikan (RAV) syarikat pelaburan kerajaan itu melonjak kepada RM121.6 bilion. 
Ia adalah RM13.4 bilion atau 12.4 peratus lebih tinggi berbanding RM108.2 bilion pada 2011 dan pertumbuhan 138.9 peratus daripada hanya RM50.9 bilion ketika penubuhannya pada Mei 2004. 


Nilai Aset Diselaraskannya (NWA) pula menokok RM16.9 bilion atau 24.3 peratus kepada RM86.9 bilion daripada RM70 bilion pada 2011.

Pengarah Urusannya, Tan Sri Azman Mokhtar, berkata prestasi cemerlang yang dicatatkan pada tahun lalu itu mencerminkan kejayaan strategi pelaburan yang dibuat kumpulan berkenaan.

“Kami percaya portfolio (pelaburan) yang dibuat sepanjang tahun lalu amat seimbang, sementara pecahan kedudukannya juga baik.

“Ini membolehkan Khazanah meraih manfaat daripada peningkatan pertumbuhan di rantau Asia Pasifik serta beberapa sektor dinamik lain yang kami jangkakan mampu terus meningkat lagi,” katanya pada sidang media di Kuala Lumpur, semalam. 
Sepanjang tahun lalu, Khazanah membuat pelaburan besar dalam beberapa syarikat terkemuka dunia, khususnya membabitkan pengambilalihan sebuah kumpulan kesihatan di Turki, iaitu Acibadem Healthcare Group sebagai sebahagian daripada langkahnya untuk meraih manfaat daripada peningkatan permintaan selain meningkatkan lagi kecairan dalam pasaran ekuiti tempatan.



Atasi penanda aras

Azman berkata, pertumbuhan NWA yang dicatatkan Khazanah tahun lalu itu mengatasi prestasi penanda aras utama Bursa Malaysia, Indeks Komposit FTSE Bursa Malaysia (FBM KLCI) serta beberapa indeks serantau lain seperti Indeks Hang Seng, MSCI Asia kecuali Jepun dan pasaran MSCI Emerging.

“Penyumbang utama kepada prestasi kukuh portfolio pelaburan kami bagi tahun lalu itu, antara lain didorong oleh pelaksanaan tawaran awam permulaan IHH Healthcare Bhd dan Astro Malaysia Holdings Bhd.

“Selain itu, pegangan Khazanah dalam sektor telekomunikasi dan tenaga yang semakin bertambah turut menjadi penyumbang kepada pertumbuhan dalam NWA itu,” katanya.

Tahun lalu, Khazanah meraih keuntungan sebelum cukai RM2.1 bilion berbanding RM5.3 bilion pada 2011, sekali gus membolehkannya mengumumkan pembayaran dividen sebanyak RM1 bilion, menjadikan jumlah keseluruhan dividen yang diisytiharkannya sejak 2010 berjumlah RM4.5 bilion.

Sepanjang tahun lalu, Azman berkata, Khazanah telah membuat tujuh pelaburan utama baru berjumlah RM6.2 bilion dan 10 pelupusan yang menjana hasil berjumlah RM4.8 bilion dan keuntungan RM2.1 bilion.

Sumber : Berita Harian 18/01/2012


MWbmt

Berita Harian | Petronas umum penemuan minyak, gas selepas 24 tahun

Berita Harian | Petronas umum penemuan minyak, gas selepas 24 tahun MWbmt

MYMRT | MRT Corp - Official webpage for the Klang Valley My Rapid Transit.

MYMRT | MRT Corp - Official webpage for the Klang Valley My Rapid Transit. MWbmt

MRT - Mass Rapid Transit in Klang Valley




THE Klang Valley MRT project involves the construction of a rail-based public transport network which, together with the existing light rail transit (LRT), monorail, KTM Komuter, KLIA Ekspres and KLIA Transit systems, form the backbone of the Greater Kuala Lumpur/Klang Valley region.
The project was approved by the Government in December 2010. The first MRT line to be implemented was the 51km Sungai Buloh-Kajang line. Construction of the line was officially launched on 8 July 2011 by the Prime Minister of Malaysia, YAB Dato’ Sri Mohd Najib Bin Tun Abdul Razak.
The MRT project was initially proposed to the Government by a private-sector consortium in early 2010. The proposal was for the construction of three MRT lines.
The Government conducted a study on the proposal and approved the implementation of the Sungai Buloh-Kajang line first. The Government decided to implement the other two lines after further studies are done on the proposed alignment in conjunction with the Greater Kuala Lumpur/Klang Valley Land Public Transport Masterplan being drawn up by the Suruhanjaya Pengangkutan Awam Darat.
The Klang Valley MRT project was also made an Entry Point Project of the Economic Transformation Programme (ETP) under the Greater Kuala Lumpur/Klang Valley National Key Economic Area (NKEA). The ETP is being implemented by the The Performance Management and Delivery Unit (Pemandu) of the Prime Minister’s Department.
With the Klang Valley MRT, the target having 50% of all journeys in the Greater Kuala Lumpur/Klang Valley region to be on public transport can be achieved.

The MRT Sungai Buloh-Kajang Line


THE first Klang Valley MRT line to be approved for implementation is the 51km MRT Sungai Buloh-Kajang Line.
The line starts from Sungai Buloh which is located to the north-west of Kuala Lumpur, runs through the city centre of Kuala Lumpur, and ends in Kajang, a fast developing town located to the south-east of Kuala Lumpur. The line serves a corridor with an estimated population of 1.2 million people.
The line will be underground for a distance of 9.5km. The line will have 31 stations of which seven will be underground.
Phase One of the MRT Sungai Buloh-Kajang Line from Sungai Buloh to Semantan will become operational by the end of 2016 while Phase Two from Semantan to Kajang will become operational by July 2017, allowing trains to serve the entire line.
Each train serving the line will have four coaches having a total capacity of 1,200 passengers. The daily expected ridership is about 400,000 passengers. The trains are expected to run at an interval of 3.5 minutes.






Click anywhere on map to Zoom in / out.
Klang Valley Integrated Rail Map

Click anywhere on map to Zoom in / out.


Also Refer :


http://www.mymrt.com.my/download/reports/GreaterKL-KlangValley-LandPublicTransport-MasterPlan.pdf







SPAD(Supervising Agency)
  • Authority over corridors & alignment
  • Study transportation demands
  • Develop integrated master plan
  • Approve railway schemes
  • Interface with working agencies

MRT Corp. Sdn Bhd(Project Co)
  • Project & asset owner
  • Submission of all key project documents (railway scheme, LA plan, EIA etc.)
  • Appoint PDP
  • Verify target cost, target time & pain/gain
  • Platform for payment disbursement
  • Appoint RapidKL as operator
  • Undertake property development potential


Danainfra• Advise, manage and raise funding for infra projects
Independent Consulting Engineer
• Design compliance

• Tender vetting

• Safety & quality
Auditor General
MMCG JV(PDP)
  • Joint-management of the procurement process
  • Quality, performance & supervision of contractors
  • Local authority approvals


Design Consultants (Civil & Systems)• Design Civil Works
Nominated by InfraCo

Design & Build

(Swiss challenge)
• Tunneling works
Joint selection by InfraCo
& PDP

Build Only

(Competitive bid)
• Civil works
Joint selection by InfraCo
& PDP

Design & Build

(Competitive bid)











Steering CommitteeChair: YAB PM
  • Overall policies and direction
  • Strategic issues resolution
  • Big decisions
  • Progress reporting
  • Meeting frequency: Quarterly

EXCOChair: YBhg. KSN
  • Complex inter-agency issues resolution
  • Medium-high impact decisions
  • Progress reporting
  • Meeting frequency: As needed
Technical CommitteeChair: SPAD
  • Progress monitoring and tracking
  • Operational and technical decisions
  • Project issues resolution
  • Meeting frequency: Weekly/Fortnightly

Implementation
Players


































MMC Gamuda
(PDP) Sdn. Bhd.



MMC Gamuda KVMRT (PDP) Sdn Bhd. was appointed as the MRT project’s Project Delivery Partner (PDP) on February 10, 2012. With this appointment, the PDP provides a single point of accountability to deliver the Sungai Buloh-Kajang (SBK) MRT line within the agreed KPI of Target Cost and Set Completion Date.
The appointment has also entrusted MMC Gamuda KVMRT (PDP) Sdn Bhd with the responsibility to:
  • develop the Engineering Design & Technical Specifications that meet the Employer’s Requirements;
  • ensure optimum performance of all other Works Packages Contractors (WPCs) in terms of quality, safety and time;
  • ensure optimum performance of all other Works Packages Contractors (WPCs) in terms of quality, safety and time; and
  • packaging works, calling tenders, evaluating bids, selecting works package contracts and distributing project awards to contractors on MRT Corp’s behalf.




























  • Independent Checking Engineer


HSS Integrated and
SNC-Lavalin (Malaysia)
Sdn Bhd JV


HSS Integrated and SNC-Lavalin (Malaysia) Sdn Bhd JV were appointed as the MRT project’s Independent Checking Engineers (ICE) on February 10, 2012. The appointment allows both companies to provide an oversight of the MRT Project and to assist MRT Corp in ensuring that the PDP delivers a safe and efficient transportation system that meets the requirement of MRT Corp and the Government.
The ICE also monitors the progress of the MRT Project, gives inputs and verifies projects before Work Package Contractors are paid.


Also Refer :   http://www.mymrt.com.my/download/reports/JalanSultanReport-English.pdf


MWbmt

CABARAN BAGI KEJAYAAN SESEORANG.

TINGGALKAN 10 PENGHAMBAT KEJAYAAN...


Saya taklah pandai sangat memotivasi ni, tapi, mungkin ini ada 


baiknya untuk kalian......


10 penghambat berikut perlu ditinggalkan untuk berjaya, iaitu:


1. Jangan biarkan pendapat atau cakap-cakap orang lain mengawal 


hidup kita.

2. Jangan malu dengan kegagalan masa lalu, sebaliknya jadikan ia 


sebagai panduan, pengajaran dan motivasi untuk berjaya.

3. Jangan tidak menetapkan matlamat, kedua-dua matlamat jangka 


pendek dan jangka panjang.

4. Jangan menunda-nunda tindakan atau usaha untuk mencapai 


matlamat yang ditetapkan.

5. Jangan buang masa begitu saja tanpa berbuat apa-apa yang 


berfaedah.

6. Jangan ingat diri sendiri saja yang betul, orang lain semua salah.


Terima dengan senang hati pendapat atau nasihat orang lain yang 

berguna.

7. Jangan lari daripada masalah yang perlu diselesaikan.

8. Jangan pandai mencari alasan tetapi tidak pandai membuat 


keputusan yang baik.

9. Jangan terlepas pandang perkara-perkara positif dalam diri dan 


kehidupan.

10. Jangan tidak menghargai masa sekarang, sehingga disia-siakan. 




Sumber : http://abufaith.blogspot.com/


MWbmt

Sunday, January 6, 2013

Untold History: Untold History : Semarrr Setaaann

Untold History: Untold History : Semarrr Setaaann: Tarik napas dalam2.... pastikan sekeliling anda senyap sunyi.  Nak best.. buat lepas pkul 12 malam.. dengan asap kemenyan lagi bagus.. pasti... MWbmt

Untold History: Untold History : Puncak-Puncak Yang Hilang

Untold History: Untold History : Puncak-Puncak Yang Hilang: bile bace psal "Singapore Stone" dalam "Disini ada Badang".. ingatkan coincidence.. A huge granite rock written in ancient language were 'bo... MWbmt

Untold History: Untold History : "Molek" That Lost Amongst Many

Untold History: Untold History : "Molek" That Lost Amongst Many: This is one of my favorite relic.. gambar bermacam-macam bangsa berarak sempena pengebumian HH Abu Bakar.  Taken in 1895.   But then,... MWbmt

Untold History: Untold History : Signature of Johore Architecture ...

Untold History: Untold History : Signature of Johore Architecture ...: Lepas aku bagitau ni.. tak jadi rahsia lagi lah. For more than 100 years tersembunyi.. it's about time to disclose everything. It's going to... MWbmt

Untold History: Untold History : Signature of Johore Architecture ...

Untold History: Untold History : Signature of Johore Architecture ...: Yang ni pulak.. architectural 'signature' HH Ibrahim Al Mashyur. Dubbed as the fearsome mason in masonic world... dia jugak tinggal kan 'c...

Thursday, January 3, 2013

Related Posts Plugin for WordPress, Blogger...

BT Social Plugin